某承包商承包某项工程,合同总价500万元,合同工期5个月。承发包双方在合同中签定的关于工程价款的条款包括:(1)预付备料款为合同总价的18%;(2)工程进度款按月结算;(3)当预付备料款与进度款达到合同总价的60%后的次月开始扣回预付款,扣回方式为按以后每月平均扣回;(4)工程保修金为合同总价的5%,在办理竣工结算时一次扣除,保修期1年;(5)材料价差调整按有关规定执行,上半年材料价差的调整系数为1.1,逐月调整进度款支付;(6)工程各月实际完成产值见下表。
月份 | 2 | 3 | 4 | 5 | 6 |
产值(万元) | 50 | 100 | 120 | 80 | 150 |