问题 阅读理解

阅读短文,判断正“T”误“F”。

      It's Saturday. It's time for supper now. But Mum isn't at home. I have to help father make supper in the

kitchen. My father is cooking meat and rice on the stove. He likes onions, but I don't. So (因此) we'll not cook

onions today. I wash the cabbages and carrots in the sink. I like them. Now, supper is ready. Oh, it's delicious.

After supper, father washes the dirty dishes and I dry them. Now, they're clean and dry. We are happy.

( ) 1. It's time for supper.

( ) 2. Mother cooks supper for us today.

( ) 3. I like carrots.

( ) 4. Father doesn't like onions.

( ) 5. After supper, father washes and dries the dishes.

答案

1. T  2. F  3. T  4. F  5. F

问答题 案例分析题

某实施监理的工程,施工总承包单位(以下简称“乙方”)按《建设工程施工合同(示范文本)》与建设单位(以下简称“甲方”)签订了施工总承包合同。合同中约定开工日期2010年3月1日,乙方每月25日向甲方提交已完工程量报告,工程进度款支付时间为次月8日。甲方依据合同推荐某电梯安装单位(以下简称丙方)作为本项目电梯安装施工单位,丙方与乙方签订了分包合同。甲方委托监理公司对工程实施施工监理。乙方项目经理开工前对本项目今后的工作作出如下安排:(1)由项目经理负责组织编制“项目施工管理实施规划”。(2)由项目总工程师负责建立项目质量管理体系,由项目生产经理负责建立安全管理体系并组织实施。(3)由项目行政管理人员负责对所有安全施工的技术要求进行交底。(4)由项目商务经理负责与劳务作业层、各协作单位、发包人、分包人的组织协调工作,解决项目中出现的各种问题。(5)由项目经理负责组织有关单位进行单位工程竣工验收。2010年5月15日,项目经理和项目商务经理一起向甲方催要4月份工程进度款。甲方说监理单位正在对4月份的工程量进行核对,工程进度款还要等一等”。项目经理立即停止施工,以催要工程进度款。电梯安装施工过程中,因甲方采购的一部电梯导轨型号到货错误,需要退换。丙方向项目监理机构提出了申请,要求补偿因退换导轨造成的费用损失。监理说此事应先找乙方”。丙方找到乙方,乙方项目经理回答:“你们是甲方推荐的,费用直接找甲方要,此事与我们没有关系”。

逐项指出乙方项目经理开工前的工作安排是否妥当。对于不妥之处说明正确做法。

判断题