问题 阅读理解

根据短文内容,回答问题。

      Elephants love water and they are very good swimmers. They like to have a bath every day. Elephants

have got six teeth. Four of the teeth are about 30cm long. Two teeth are much longer. They can be over

100 cm. Elephants eat plants. They eat about 225 kilograms (千克) a day. They can drink 140 liters (升) of

water. An elephant can live for about 70 years.

1. Are the elephants good at swimming?

____________________________________________________________

2. How long are the two longer teeth?

____________________________________________________________

3. What do elephants often eat?

____________________________________________________________

4. How much water can an elephant drink a day?

____________________________________________________________

5. How long can elephants live?

____________________________________________________________

答案

1. Yes, they are.

2. The two longer teeth can be over 100 cm.

3. They often eat plants.

4. An elephant can drink 140 liters of water a day.

5. Elephants can live for about 70 years.

答案不唯一

单项选择题
问答题

[背景材料]
某投资公司建造一幢办公楼,采用公开招标方式选择施工单位。招标文件要求:提交投标文件和投标保证金的截止时间为2008年5月30日。该投资公司于2008年3月6日发出招标公告,共有5家建筑施工单位参加了投标。第5家施工早位于2008年6月2日提交了投标保证金。开标会于2008年6月3日由该省建委主持。第4家施工单位在开标前向投资公司要求撤回投标文件和退还投标保证金。经过综合评选,最终确定第2家施工单位中标。投资公司(甲方)与中标单位(乙方)双方按规定签订了施工承包合同,合同约定开工日期为2008年8月16日。工程开工后发生了如下几项事件。
事件一:因拆迁工作拖延,甲方于2008年8月18日才向乙方提供施工场地,导致乙方 A、B两项工作延误了2d,并分别造成人工窝工6个和8个工日,但乙方C项工作未受影响。
事件二:乙方与机械设备租赁商约定,D项工作施工用的某机械应于2008年8月28日进场,但因出租方原因推迟到当月29日才进场,造成D工作延误ld和人工窝工7个工日。事件三:因甲方设计变更,乙方在E项工作施工时,导致人工增加14个工日,相关费用增加了1.5万元,并使施工时间增加2d。
事件四:在F项工作施工时,因甲方供材出现质量缺陷,乙方施工增加用工6个工日,其他费用1000元,并使H项工作时间延长1d,人工窝工24个工日。上述事件中,A、D、H三项工作均为关键工作,没有机动时间,其余工作均有足够的机动时间。
[问题]

合同约定人工费标准为30元/工日,应由甲方给予补偿的窝工人工费标准为18元/工日;施工管理费、利润等均不予以补偿。在该工程中,乙方可得到的合理费用索赔有哪几项费用索赔额是多少