搜题请搜索小程序“爱下问搜题”
问题
多项选择题
招标采购项目进度计划必须具有( )。
A.持久性
B.合理性
C.紧凑性
D.可靠性
E.科学性
答案
参考答案:
B,C
选择题
The novel gone with wind is said _____ into several language.
A. to translate
B. being translated
C. having been translated
D. to have been translated
查看答案
问答题
求根限[*].
查看答案