装表接电员接到高压用电报装装表接电工作单后,按《电能计量管理标准》有关规定,()个工作日内完成装拆表任务。
A.4
B.5
C.6
D.7
参考答案:B
As an important phase in software development, software design is the continuation of software requirement analysis phase.
Ⅰ.software structure
Ⅱ.software procedure
Ⅲ.software module
Ⅳ.software document
which of the following should be included in software design phase ?()
A.Ⅰand Ⅱ
B.Ⅱand Ⅲ
C.Ⅰ,Ⅱ and Ⅲ
D.All
具有升阳举陷、托毒生肌、利水消肿功效的药物是()
A.人参
B.西洋参
C.党参
D.太子参
E.黄芪