()更偏重于让项目的利益相关者在项目决策和实施等具体活动中发挥作用。
A.传统行动
B.传统评价
C.参与式行动
D.参与式评价
参考答案:C
接地引入线的铜质电缆与镀锌扁钢之间的连接,应通过过渡铜铁排连接,过渡排宜固定良好,如固定外墙时,其高度宜不低于()m,固定螺栓紧固后与过渡排之间点焊。
A.1
B.1.5
C.2
D.2.5
In low-speed network,it is usually adequate to wait for congestion to occur and then react to it bytelling the source of packets to slow down.In high-speed networks,this approach often works poorly,because in the (71) between sending the notification and notification arriving at the source,thousands of additional (72) may arrive.In ATM network,a major tool for preventing (73) is (74) control.When a host wants a new virtual (75) ,it must describe the traffic to be offeredand the service expected.
(74)处填()。
A.flow
B.admission
C.traffic
D.time