问题 完形填空
If you go into the forests with friends, stay with them. If you don’t, you may get lost. If you do get lost, this is what you should do.

Sit down and stay where you are. Don't try to find your friends. Let them find you. You can help them to find you by staying in one place.
There is another way to help your friends or other people to find you. Give them a signal( 信号 )by shouting or whistling(吹口哨) three times. Stop. Then shout and whistle three times again. And signal given three times is a call for help,
If you don't think that you will get help before night comes, try to make a small room with branches( 树枝 ) 。
What should you do if you get hungry or need to drink water? You would have to leave your little branch room to look for something to eat and drink. Don't just walk away. Drop small branches as you walk so that you can find your way hack.
The important thing to do when you are lost -- stay in one place.
    Title
 How to deal with getting lost
 
Ways
①__小题1:___and stay where you are
②Give friends __小题2:__by shouting and whistling three times
③If you don’t get help before night comes, try to_小题3:a room with branches
④Drop some small 小题4:as you walk so that you can find your way back.
  Conclusion
 There are many ways to deal with getting lost,but the most important
Way is to stay in ___小题5:__place .
答案

小题1:sit down 

小题2:a signal

小题3:make

小题4:branches

小题5:one

题目分析:短文大意:本文介绍了如果你在森林里迷路了,你应该怎么做。坐下来呆在你现在的地方。不要试着去找你的朋友。让他们找到你。有一个办法可以帮助你的朋友或其他人找到你。给他们一个信号或吹口哨三次。

小题1:根据第二段首句Sit down and stay where you are.可知该填写sit down 。

小题2:根据第三段第二句Give them a signal( 信号 )by shouting or whistling(吹口哨) three times 可知该填写a signal。

小题3:根据第四段  If you don't think that you will get help before night comes, try to make a small room with branches 可知该填写make。

小题4:根据第五段末. Drop small branches as you walk so that you can find your way hack.可知该填写branches。

小题5:根据最后一段The important thing to do when you are lost -- stay in one place 可知该填写one。

选择题
问答题

A公司中标某市城区高架路工程第二标段。本工程包括高架桥梁、地面辅道及其他附属工程:工程采用工程量清单计价,并在清单中列出了措施项目;双方签订了建设工程施工合同,其中约定工程款支付方式为按月计量支付,并约定发生争议时向工程所在地仲裁委员会申请仲裁。
对清单中某措施项目,A公司报价100万元。施工中,由于该措施项目实际发生费用为180万元,A公司拟向业主提出索赔。
业主推荐B公司分包钻孔灌注桩工程,A公司审查了B公司的资质后,与月公司签订了工程分包合同。在施工过程中,由于月公司操作人员违章作业,损坏通信光缆,造成大范围通信中断,A公司为此支付了50万元补偿款。
A公司为了应对地方材料可能涨价的风险,中标后即与某石料厂签订了价值400万元的道路基层碎石料的采购合同,约定了交货日期及违约责任(规定违约金为合同价款的5%)并交付了50万元定金。到了交货期,对方以价格上涨为由提出中止合同,A公司认为对方违约,计划提出索赔。
施工过程中,经业主同意,为保护既有地下管线,增加了部分工作内容而原清单中没有相同项目。
工程竣工,保修期满后,业主无故拖欠A公司工程款,经多次催要无果。A公司计划对业主提起诉讼。
问题:
1.在投标报价阶段,为既不提高总价且不影响中标,又能在结算时得到更理想的效益,组价以后可以做怎样的单价调整A公司就措施项目向业主索赔是否妥当说明理由。