某市一栋综合楼,地下共4层,地上共20层,采用框架剪力墙结构,总建筑面积30万m2,主楼与其裙房之间设有防火墙等防火分隔设施,主楼各层建筑面积均大于1000m2。该综合楼总平面布局及周边民用建筑等相关信息如图1所示。该综合楼地下3、4层均为人防层,其主要使用功能均为普通汽车库、复式汽车库和储存可燃固体的库房;地下2层主要使用功能为展览厅、管理用房及燃气锅炉房、柴油发电机房、变压器室、配电室、消防泵房等设备用房;地下1层主要使用功能为消防控制室、管理用房及商场营业厅。主楼首层主要使用功能为门厅、咖啡厅、自助餐厅、商场营业厅,地上2、3层主要使用功能为儿童游乐厅、展览厅、商场营业厅,地上4~19层主要使用功能为办公室,地上20层主要使用功能为会议厅、多功能厅。裙房1~6层主要使用功能为商场营业厅。该建筑按有关国家工程建设消防技术标准配置了室内外消火栓给水系统、自动喷水灭火系统和火灾自动报警系统等消防设施及器材。

根据以上场景,回答下列问题。

消防水泵的启动方式分为哪几种?

答案

参考答案:

消防水泵的启动方式分为:自动启动和手动启动。

单项选择题
单项选择题

A

Imagine, one day, getting out of bed in Beijing and being at your office in Shanghai in only a couple of hours, and then, after a full day of work, going back home to Beijing and having dinner there.

Sounds unusual, doesn’ t it But it’ s not that unrealistic, with the development of China’ s high-speed railway system. And that’ s not all. China has an even greater high-speed railway plan to connect the country with Southeast Asia, and eventually Eastern Europe.

China is negotiating to extend its own high-speed railway network to up to 17 countries in 1 0 to 15 years, eventually reaching London and Singapore.

China has proposed three such projects. The first would possibly connect Kunming with Singapore via Vietnam and Malaysia. Another could start in Urumqi and go through Kazakhstan and Uz-bekistan, and possibly to Germany. The third would start in the northeast and go north through Russia and then into Western Europe.

If China’ s plan for the high-speed railway goes forward, people Could zip over from London to Beijing in under two days.

The new system would still follow China’ s high-speed railway standard. And the trains would be able to go 346 kilometers an hour, almost as fast as some airplanes.

China’s bullet train(高速客车), the one connecting Wuhan to Guangzhou, already has the World’ s fastest average speed, It covers 1,069 kilometers in about three hours.

Of course, there are some technical challenges to overcome. There are so many issues that need to be settled, such as safety, rail gauge (轨距), maintenance of railway tracks. So it’s important to pay attention to every detail.

But the key issue is really money. China is already spending hundreds of billions of yuan on domestic railway expansion.

China prefers that the other countries pay in natural resources rather than with capital investment. Resources from those countries could stream into China to sustain development.

It’ll be a win-win project. For other countries, the railway network will definitely create more opportunities for business, tourism and so on, not to mention the better communication among those countries.

For China, such a project would not only connect it with the rest of Asia and bring some much-needed resources, but would also help develop China’ s far west. We foresee that in the coming decades, millions of people will migrate to the western regions, where the land is empty and resources unused. With high-speed trains, people will set up factories and business centers in the west once and for all. And they’ 11 trade with Central Asian and Eastern European countries.

Which of the following might be the best title for the passage()

A. New Railway Standards

B. Big Railway Dreams

C. High-speed Bullet Trains

D. International Railway Network