加大流量
参考答案:
灌溉工程运行过程中可能出现一些难以准确估计的附加流量,把设计流量适当放大后所得到的安全流量。
I am so tired today. I swam _____ the river in the morning and I walked ____ the forest in the afternoon.
A.through, through
B.across, across
C.across, through
D.through, across
事务故障恢复时要对事务的每一个操作执行逆操作,即将日志记录中“______”写入数据库中。