问题 单项选择题

作为一名项目经理,你了解一些不同的冲突解决方法。你现在的建筑项目小组的两名成员就防风暴护窗的安装问题发生分歧。他们拒绝听取对方的意见。虽然当时是三月,飓风季节六月才来到,一场不同寻常的风暴不到8小时就会袭击当地。必须马上安装防护护窗,否则整个项目都会遭到破坏。最合适的解决冲突的方法是:()。

A、双方通融

B、折中

C、合作

D、强制

答案

参考答案:D

单项选择题
单项选择题 共用题干题

Information systems design is defined as those tasks that focus on the specification of a detailed computer-based solution. Typically, there are four systems design tasks for in-house development. 1)The first task is to specify (1), which defines the technologies to be used by one, more, or all information systems in terms of their data, processes, interfaces, and network components. This task is accomplished by analyzing the data models and process models that are initially created during requirements analysis. 2)The next systems design task is to develop the (2). The purpose of this task is to prepare technical design specifications for a database that will be adaptable to future requirements and expansion. 3)Once the database prototype has been built, the systems designer can work closely with system users to develop input, output and dialogue specifications. The (3) must be specified to ensure that the outputs are not lost, misrouted, misused, or incomplete. 4)The fourth design task involves packaging all the specifications from the previous design tasks into a set of specifications that will guide the (4) activities during the following phases of the systems development methodology. Finally, we should (5) and update the project plan accordingly. The key deliverable should include a detailed plan for the construction phase that should follow.

空白(2)处应选择()

A.database design specifications

B.database organization decisions

C.data structure specifications

D.data distribution decisions