测井集流环的炭刷与铜环之间应保持良好的接触,其接触电阻应()。
A.小于0.5Ω
B.小于10Ω
C.大于1Ω
D.大于5Ω
参考答案:A
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable () of the technical requirements for the software product. During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each () that it must meet. The starting point is usually a set of high-level requirements from the () that describe the project or problem. In either case, the requirements definition team formulates an overall concept for the system and then defines () showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR). Following the SCR, the team derives () requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
Following the SCR, the team derives()requirements for the system from the high level requirements and the system and operations concept.
A.detailed
B.outlined
C.total
D.complete
一般过滤操作有()等组成一个操作循环。
A、过滤
B、吸附
C、洗涤或吹扫
D、卸渣