问题 单项选择题

开采矿藏或者建设地下工程,因疏干排水导致地下水水位下降、水源枯竭或者地面塌陷,采矿单位或者建设单位应当采取();对他人生活和生产造成损失的,依法给予补偿。

A.治理措施

B.补救措施

C.保护措施

答案

参考答案:B

完形填空
I was blind, but I was ashamed of it if it was known. I refused to use a white stick and  36  asking for help. After all, I was a teenage girl, and I couldn’t bear people to look at me and think I was not  37  them. I must have been a terrible danger on the roads. Coming across me wandering through the traffic, motorists probably would have to step  38  on their brakes. Apart from that, there were all sorts of disasters that used to occur on the way to and from work.
One evening, I got off the bus about halfway home where I had to change buses, and as usual I  39  something. “I’m awfully sorry,” I said and stepped forward only to run into it again. When it happened a third time, I realized I had been  40  to a lamppost. This was just one of the  41  things that constantly happened to me. So I carried on and found the bus stop, which was a request stop, where the bus wouldn’t stop  42  passengers wanted to get on or off. No one else was there and I had to try to guess if the bus had arrived.
Generally in this situation, because I hated  43   I was blind by asking for help, I tried to guess at the sound. Sometimes I would  44  a big lorry and stand there feeling stupid as it drew away. In the end, I usually managed to  45  my pride and ask someone at the stop for help.
 46  on this particular evening no one joined me at the stop; it seemed that everyone had suddenly decided not to travel by bus. Of course I heard plenty of buses pass, or I thought I did. But because I had given up stopping them  47  making a fool of myself. I let them all go by. I stood there alone for half an hour without stopping one. Then I gave up. I decided to walk on to the next stop.
小题1:
A.tendedB.likedC.hatedD.objected
小题2:
A.likeB.againstC.atD.for
小题3:
A.bravely B.rapidlyC.slowlyD.cautiously
小题4:
A.came intoB.ran intoC.got intoD.turned into
小题5:
A.sayingB.talkingC.apologizingD.arguing
小题6:
A.unexpectedB.arbitraryC.objectiveD.stupid
小题7:
A.ifB.whenC.unlessD.as long as
小题8:
A.showingB.acceptingC.representing D.understanding
小题9:
A.planB.stopC.get onD.ask for
小题10:
A.revealB.substitute C.submitD.swallow
小题11:
A.ButB.SoC.ForD.While
小题12:
A.in spite ofB.for fear ofC.instead ofD.in terms of
问答题 案例分析题

某安装公司中标了某贸易中心大楼的电气安装工程,该工程采用以人工费为取费基数的全费用综合单价计价。中标工程量清单如表1所示,措施项目总费用为210万元。

合同约定:对于施工过程中发生的设计变更,合同清单中有的项目,按合同清单中的综合单价计价,清单中没有的采用当地现行安装工程预算定额,以定额人工费为基数,按管理费50%、利润20%、规费21%、安全文明施工专项费9%、确定全费用综合单价,工程所在地建安税率3.48%

合同签订后,安装公司编制了施工进度网络计划,并经监理工程师批准。如图所示(单位:月)。

施工中发生了如下事件:

事件1:施工开始后遇到季节性降雨,安装公司对已完工程采取了保护措施并发生了保护措施费用10万元;由于地处繁华路段,安装公司提高了安全防范等级,比常规工程增加了10万元的防护措施费用。

事件2:施工至第2月末,建设单位发出设计变更,将原计划由电力部门施工的高压配电柜安装工作改由安装公司实施,按照施工工艺,高压配电柜安装工作需在变压器安装工作结束后开始,在低压配电柜安装工作开始前完成,持续时间需要1个月。高压配电柜安装工程直接费54000元/台,其中人工费10000元/台,工程量10台。

事件3:高压配电柜安装完成后,安装公司向建设单位提出承担包括高压试验在内的高压配电柜试验和调整工作的请求,建设单位和监理单位审查后认为安装公司未获得许可,予以拒绝。

计算合同总价、事件2中新增加的高压配电柜安装工作全费用综合单价、设计变更后增加的工程款以及变更后的总造价。