贷款人应落实具体的责任部门和岗位,对固定资产贷款进行全面的风险评价,并形成()。
A、风险评价报告
B、资产评估报告
C、贷款责任报告
D、贷款调查报告
参考答案:A
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (1) of the technical requirements for the software product.
During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each (2) that it must meet. The starting point is usually a set of high-level requirements from the (3) that describe the project or problem.
In either case, the requirements definition team formulates an overall concept for the system and the defines (4) showing how the system will be operated, publishes the system and operation concept documents,and conducts a system concept review(SCR).
Following the SCR, the team derives (5) requirements for the system from the highlevel requirements and the system operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirements.
3()
A.producer
B.customer
C.programmer
D.analyser
用于家庭数据传送的线缆应采用五类以上标准的对称电缆,其最高传输频率应大于()。
A、100MHz
B、110MHz
C、120MHz
D、130MHz