施工项目成本控制时,工程计量的计算方法有()。
A、现场测量
B、按单据计算
C、按设计图纸测算
D、按施工单位上报量计算
参考答案:A, B, C
If the steersman of your lifeboat gives the command Way enough,you should().
A.complete the stroke,hold your oar out from the boat and level with the water
B.dip the blade of your oar into the water and leave it there
C.lift your oar to a vertical position
D.complete the stroke,raise your oar slightly,swing it forward,and place it in the boat
AutoCAD 2004按缺省安装后位于下拉菜单下面水平方向的工具条有()。
A、绘图工具条
B、修改工具条
C、标准工具条
D、对象特性工具条
E、图层工具条