问题 单项选择题

The United States is well known for its network of major highways designed to help a driver get from one place to another in the shortest possible time.Although these wide modem roads are generally (1) and well maintained, with few sharp curves and straight sections, a direct route is not always the most (2) one. Large highways often pass (3) scenic areas and interesting small towns. Furthermore, these highways generally (4) large urban centers, which means that they become crowded with heavy traffic during rush hours, (5) the" fast, direct" route becomes a very slow route.However,there is almost always another route to take if you are not in a hurry. Not far from the (6) new" superhighways", there are often older, (7) heavily traveled roads which go through the countrvside. (8) of these are good two-lane roads ; others are uneven roads curving through the country. These secondary routes may go up steep slopes, along high cliffs, or down frightening hillside to towns (9) in deep valleys. Through these less direct routes, longer and slower, they generally go to places (10) the air is clean and scenery is beautiful, and the driver may have a chance to get a fresh, clean view of the world.

 

第(8)空应选择()

A.All

B.Several

C.Lots

D.Some

答案

参考答案:D

解析:

从下文的others可知此空正确答案为some。

问答题 案例分析题

某电解铝厂位于甲市郊区,已经生产10年,现有工程规模为7万t/a电解铝,主要设备为60kA自焙阳极电解槽160台,产量20000t/a;120kA预焙阳极电解槽120台,产量50000t/a。自焙阳极电解槽含氟烟气采用干法净化回收装置,但由于其设计存在一些问题,电解车间天窗仍有大量无组织烟气排放,氟实际去除率80%。预焙阳极电解槽电解过程中产生的含氟烟气经密闭集气罩收集后送往干法净化系统,采用氧化铝吸附剂处理,吸附后的载氟氧化铝再回收进入电解槽,氟实际去除率95%。拟建项目为年产电解铝5万t的预焙阳极电解槽,主要设备为200kA预焙阳极电解槽100台,扩建现有渣场以满足需要;建设项目投产时同时淘汰现有60kA自焙阳极电解槽80台,淘汰产能10000t/a,其他自焙阳极电解槽全部停产。新建项目含氟烟气也采用氧化铝吸附干法净化系统,氟设计去除率95%以上。项目建成后,全厂达到年产10万t电解铝的生产规模。全厂主要废水来自煅烧循环水和生阳极(生阳极指阳极炭块的生产)系统浊循环水系统,经过废水处理站处理后外排地表水系(Ⅴ类水体),少量的焙烧炉修理时产生的废渣送渣场填埋。经过2个月的试生产,生产设施、环保设施运行正常,现委托某监测站进行建设项目竣工验收监测。进行环境影响评价时,监测了6个点位,其中南面500m处A村庄氟化物60%超标,新建工程采用先进的烟气治理措施,同时淘汰老旧设备。厂外各敏感点预测氟化物浓度都将有不同程度下降并可满足标准,外排氟化物从160t/a减少到108t/a,烟粉尘排放量减少到345t/a,SO2排放量减少到450t/a,可满足地方环保局原分配的450tSO2总量指标。公众调查时,A村庄有24个居民反对该项目建设,占调查对象的12%。

该项目竣工验收的现场调研重点包括哪些方面?

单项选择题