脐静脉插管后导管末端应位于
A.上腔静脉B.脐静脉C.下腔静脉D.肝静脉E.颈静脉
参考答案:C
Ravi, like many project (126) , had studied the waterfall model of software development as the primary software life-cycle (127) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (128) and not as (129) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (130) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
A.parts
B.modules
C.software
D.a whole
按照建设部的有关规定,对达到一定规模的危险性较大的分部分项工程中涉及深基坑、地下暗挖工程、高大模板工程的专项施工方案,施工单位应当组织()进行论证、审查。
A.专家
B.监理工程师
C.施工单位技术人员
D.专业监理工程师