PE管内插施工时,要确定工作坑的长度,确保穿管在()PE管的允许弯曲半径的条件下进行,避免PE芯管过度弯曲。
参考答案:大于
打满水缸要11桶水。王林每次只能提两桶水,要打满水缸他需要走几趟?()
A.5
B.11/2
C.6
D.16/2
E.7
The Border Gateway Protocol (BGP) is an interautonomous system (76) protocol. The primary function of a BGP speaking system is to exchange network (77) information with other BGP system. This network reachability information includes information on the list of Autonomous System (ASs) that reachability information traverses. BGP-4 provides a new set of mechanisms for supporting (78) interdomain routing. These mechanisms include support for advertising an IP (79) and eliminate the concept of network class within BGR BGP-4 also introduces mechanisms that allow aggregation of routes, including. (80) of AS paths. These changes provide support for the proposed supernettting scheme.
(80)是()
A.connecting
B.resolving
C.routing
D.supernettting