问题 单项选择题

关于呼气末二氧化碳分压监测的叙述,哪项不正确:()

A.二氧化碳分压的监测结果可以替代血气分析测得的结果

B.如果检测时间较长时,需要重新调定零点

C.如果二氧化碳监测窗中有泠凝水,会影响监测结果的准确性

D.现二氧化碳分压的监测方法多采用旁流型

E.行二氧化碳分压监测前需要先调零点

答案

参考答案:A

阅读理解

The Sydney Opera House is a very famous building in the world. It has become Sydney’s best-known landmark and international symbol. The Opera House with a “sailing roof” was designed by a famous Danish architect(丹麦建筑师), Utzon. The base(基础)of the building was started in 1959, years before the designs were finished. Utzon spent four years deigning the Opera House. In 1962, the designs were finalized(定稿)and the construction began. In 1967, they started the decoration inside. It took 14 years in total to build the Opera House. Queen Elizabeth Ⅱ officially opened it on October 20th, 1973.

The Sydney Opera House cost around $100 million and was paid for by the public. 6225 square metres of glass was used to build it. The Opera House includes 1000 rooms. It is 185 metres wide. The building’s roof sections weigh about 15 tons. Each year, this fantastic building attracts 200 000 tourists to come for a visit or enjoy events in it.

The Opera House reaches out into the harbour(港湾). It is amazing and unforgettable, offering people a strong sense of beauty.

小题1:The designer of the Sydney Opera House was from _____________.

A.America

B.Australia

C.England

D.Denmark小题2: Building the Opera House lasted _____________.

A.from 1959 to 1973

B.from 1962 to 1973

C.from 1959 to 1967

D.from 1962 to 1967小题3:The underlined word “construction” means _______ in Chinese.

A.创立

B.设计

C.施工

D.竣工小题4:___________ paid for the cost of the building of the Sydney Opera House.

A.Utzon

B.The public

C.Queen Elizabeth Ⅱ

D.The government小题5:Which is the best title for the passage?

A.Sailing Roof

B.Travelling in Sydney

C.The Sydney Opera House

D.The Opening of the Opera House

单项选择题