问题 单项选择题

An example of scope verification is ().

A.review the performance ofan installed software module

B.managing changes to the project schedule

C.decomposing the WBS to a work package level

D.performing a benefit/cost analysis to determine if we should proceed with the project

答案

参考答案:A