问题
选择题
_____ 202 km Shanghai-Hangzhou high-speed railway, with _____ designed speed of 350 km per hour,
began its operation on Oct 26, 2010. [ ]
A. The; a
B. The; the
C. A; a
D. A; the
答案
答案:A
_____ 202 km Shanghai-Hangzhou high-speed railway, with _____ designed speed of 350 km per hour,
began its operation on Oct 26, 2010. [ ]
A. The; a
B. The; the
C. A; a
D. A; the
答案:A