更改的控制和设计的控制一样,也要经过评审、验证、确认。
参考答案:对
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (46) of the technical requirements for the software product. During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each (47) that it must meet. The starting point is usually a set of high-level requirements from the (48) that describe the project or problem. In either case, the requirements definition team formulates an overall concept for the system and then defines (49) showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review (SCR). Following the SCR, the team derives (50) requirements for the system from the high-level requirements and the system and operations concept. Using structured or object-oriented analysis the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
A.rules
B.principles
C.programmer
D.scenes
产蛋期的鹅在饲料中加入石粉,是为了减少鹅产()。
A、砂皮蛋
B、软壳蛋
C、钢壳蛋