在灭火救援战斗中,指挥员要重点掌握火场内有无()、触电和建筑物倒塌的危险。
A.爆炸、毒气
B.贵重物品
C.带电设备
D.燃气泄漏
参考答案:A
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable () of the technical requirements for the software product. During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each () that it must meet. The starting point is usually a set of high-level requirements from the () that describe the project or problem. In either case, the requirements definition team formulates an overall concept for the system and then defines () showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR). Following the SCR, the team derives () requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
The starting point is usually a set of high-level requirements from the () that describe the project or problem.
A.producer
B.customer
C.programmer
D.analyser