可以按设计阶段和施工阶段委托监理单位的是( )模式下的监理模式。
A.平行承发包
B.设计或施工总分包
C.项目总承包
D.项目总承包管理
参考答案:B
In June 1985, two British mountaineers Joe Simpson and Simon Yates made the first-ever climb of the 21,000-foot snow-covered Siula Grande mountain in Peru. It was an exceptionally (26) job, but nothing compared to what was to (27) . Early in the process, Simpson (28) and broke his right knee. Yates could have (29) him but managed to find a way of (30) him down the mountains on a rope in a series of difficult drops. Then Simpson fell into a crevasse and Yates eventually had no (31) but to cut the (32) , completely convinced that his friend was now (33)
In his book on the (34) , Joe Simpson wrote:
(35) I looked at the distant moraines, I know that I must at least try I would probably (36) there among those rocks. If I died, well, that wasn’t so (37) , but I wouldn’t have (38) waited for it to happen. The (39) of dying no longer affected me as it had in the crevasse at first. I now had a chance to (40) it and struggle against it.
The survival of Yates himself was (41) . That Simpson somehow found a way of (42) out of the crevasse after 12 hours and then crawled and (43) himself six miles back to camp, (44) three days and might without food or drink, would be considered as a heroic fiction. But in fact it was so (45) .
26().
A. tough
B. good
C. easy
D. new
液氨中的油含量并不会影响氨冷器的换热效果。