问题 多项选择题

由于招标投标的()特点,对节约资金和提高采购质量具有显著作用,因而成为市场经济国家在大宗交易特别是政府及公共领域广泛推行的一种采购制度。

A.竞争性

B.广泛性

C.公开性

D.公益性

E.公平性

答案

参考答案:A, C, E

阅读理解

Once a circle missed a wedge(楔子). The circle wanted to be whole, so it went around looking for its missing piece. But because it was incomplete and therefore could roll only very slowly.  It admired the flowers along the way. It chatted with grasses. It enjoyed the sunshine. It found lots of different pieces, but none of them fit. So it left them all by the side of the road and kept on searching. Then one day the circle found a piece that fit perfectly. It was so happy. It put the found piece into itself and began to roll. Now it was a perfect circle, it could roll very fast, too fast to notice the flowers or to talk to the grasses. When it rolled so quickly, it realized how different the world seemed. Then it stopped, left the found piece by the side of the road and rolled slowly away.

The lesson of the story , I suggested, was that in some strange sense we are more whole when we are missing something. The man who has everything isn’t in some ways a whole man. He will never know what it feels like to yearn(渴望), to hope, to come true the dream of something better.

根据短文内容,判断句子正(T)误(F)。 (共5小题,每小题2分,满分10分)

小题1: At first, the circle couldn’t roll fast, because it wanted to chat with the grasses.

小题2: The circle didn’t find the missing piece at last.

小题3: When it was a perfect circle, it rolled too fast to notice the flowers or to talk to the grasses.

小题4: The circle stopped by the side of the road and enjoyed the sunshine.

小题5: In some days, a man still will be perfect even if he misses something.

问答题 案例分析题

背景

某市政务服务中心办公大楼工程,地下为3层连体车库,地上20层。裙房4层,檐高27m,报告厅混凝土结构局部层高8m,演艺厅钢结构层高8m。框架一剪力墙结构,基础埋深12m。地下水位在底板以上2m。桩基、裙房采用落地式钢管脚手架。某施工总承包单位中标后成立了项目部组织施工。施工过程中发生了如下事件:

事件一:项目部编制了《安全生产管理措施》。其中对基础工程施工安全隐患的主要表现形式进行了分析,归纳为挖土机械作业无可靠的安全距离;没有按规定放坡或设置可靠的支撑;设计的考虑因素和安全可靠性不够;地下水没做到有效控制;土体出现渗水、开裂、剥落。监理工程师认为分析不全。

事件二:项目部编制了《安全生产管理措施》。其中基础工程施工安全控制的主要内容是挖土机械作业安全;边坡与基坑支护安全;降水设施与临时用电安全等3项。监理工程师认为不全。

事件三:项目部编制了《土方开挖专项施工方案》。主要内容应包括:放坡要求、支护结构设计、机械选择、开挖时间、开挖顺序、分层开挖深度。监理工程师认为分析不全。

事件四:项目部编制了《土方开挖监控方案》。主要内容应包括:监控目的、监测项目、监控报警值、监测方法及精度要求。监理工程师认为不全。

事件五:项目部编制了《脚手架专项施工方案》。其中对脚手架的阶段验收进行了规定:脚手架基础完工后,架体搭设前i每搭设完10~13m高度后或3~5步后;作业层上施加荷载前。同时规定:脚手架定期检查的主要内容包括杆件的设置与连接,连墙件、支撑、门洞桁架的构造是否符合要求i地基是否积水,底座是否松动,立杆是否悬空,扣件螺栓是否松动;是否有超载使用现象。监理工程师认为不全。

事件四中,《土方开挖监控方案》主要内容还应包括哪些?