在工程项目策划和决策阶段,项目建议书、可行性研究报告是( )的工作成果。
A.业主
B.承包商
C.咨询工程师
D.项目经理
参考答案:C
(71) analysis emphasizes the drawing of pictorial system models to document and validate both existing and/or proposed systems. Ultimately, the system models become the (72) for designing and constructing an improved system. (73) is such a technique. The emphasis in this technique is process-centered. Systems analysts draw a series of process models called (74) . (75) is another such technique that integrates data and process concerns into constructs called objects.
(73)处填()。
A.Structured analysis
B.Information Engineering
C.Discovery Prototyping
D.bject-Oriented analysis
在SQL Server中,触发器不具有()类型。
A.insert触发器
B.update触发器
C.delete触发器
D.select触发器