专业工作队在一个施工段上的施工作业时间称为( )。
A.工期
B.流水步距
C.自由时差
D.流水节拍
参考答案:D
解析:[知识点] 流水施工参数——时间参数
In June 1985, two British mountaineers Joe Simpson and Simon Yates made the first-ever climb of the 21,000-foot snow-covered Siula Grande mountain in Peru. It was an exceptionally (26) job, but nothing compared to what was to (27) . Early in the process, Simpson (28) and broke his right knee. Yates could have (29) him but managed to find a way of (30) him down the mountains on a rope in a series of difficult drops. Then Simpson fell into a crevasse and Yates eventually had no (31) but to cut the (32) , completely convinced that his friend was now (33)
In his book on the (34) , Joe Simpson wrote:
(35) I looked at the distant moraines, I know that I must at least try I would probably (36) there among those rocks. If I died, well, that wasn’t so (37) , but I wouldn’t have (38) waited for it to happen. The (39) of dying no longer affected me as it had in the crevasse at first. I now had a chance to (40) it and struggle against it.
The survival of Yates himself was (41) . That Simpson somehow found a way of (42) out of the crevasse after 12 hours and then crawled and (43) himself six miles back to camp, (44) three days and might without food or drink, would be considered as a heroic fiction. But in fact it was so (45) .
31()
A.idea
B.hope
C.choice
D.chance
对于直径较小的塔,处理有腐蚀性的物料或减压蒸馏系统时,都表现出明显优越性的塔没备是( )。
A.蒸馏塔 B.填料塔 C.板式塔 D.吸收塔