问题
单项选择题
In 1979 an extensive()program was in progress throughout Suez Canal.
A.a dredge and widen
B.dredged and widened
C.dredging and widening
D.being dredging and widening
答案
参考答案:C
In 1979 an extensive()program was in progress throughout Suez Canal.
A.a dredge and widen
B.dredged and widened
C.dredging and widening
D.being dredging and widening
参考答案:C