钻井生产应先设计(包括补充设计和设计变更)后施工,坚持无设计不可施工的原则。
参考答案:错
In low - speed network ,it is usually adequate to wait for congestion to occur and then react to it by telling the source of packets to slow down. In high - speed networks, this approach often works poorly, because in the (71) between sending the notification and notification arriving at the source, thousands of additional (72) may arrive. In ATM network , a major tool for preventing (73) is (74) control. When a host wants a new virtual (75) ,it must describe the traffic to be offered and the service expected.
A.flow
B.admission
C.traffic
D.time
防烟分区的划分应采用()
A.隔墙
B.挡烟垂壁
C.从顶棚下突出不小于1m的梁划分
D.风屏