问题
单项选择题
A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().
A.cargo has been loaded or discharged
B.cargo ghose is connected
C.cargo pumps are started
D.vessel is ready to handle cargo
答案
参考答案:D