问题 单项选择题

The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().

A.on a tug standing by

B.available by contract with the shore facility

C.kept at the shoreside hose connection during transfer

D.kept in a protected shoreside location readily accessible

答案

参考答案:B

单项选择题
多项选择题