问题 单项选择题

The shear rams of a ship blowout preventer stack are used in emergency well control to().

A.close and seal around the drill pipe

B.close and seal around casing

C.cut off pipe inside the preventer stack

D.close and seal around drill collars

答案

参考答案:C

单项选择题 B型题
单项选择题