问题
单项选择题
The shear rams of a ship blowout preventer stack are used in emergency well control to().
A.close and seal around the drill pipe
B.close and seal around casing
C.cut off pipe inside the preventer stack
D.close and seal around drill collars
答案
参考答案:C