工程承包商应在索赔事件发生后()天内,向业主方发出索赔意向通知。
A.7
B.14
C.28
D.60
参考答案:C
In low-speed network, it is usually adequate to wait for congestion to occur and then react to it by telling the source of packets to slow down. In high-speed networks, this approach often works poorly, because in the (1) between sending the notification and notification arriving at the source, thousands of additional (2) may arrive. In ATM network, a major tool for preventing (3) is (4) control. When a host wants a new virtual (5) ,it must describe the traffic to be offered and the service expected.
4()
A.flow
B.admission
C.traffic
D.time
吸引创新人才的招聘制度有以下,其中不对的是()。
A.合理评估人员需求及数量
B.招聘重点大学、高学历人才
C.采用情景面试等考核方法
D.建立备选人才库