试计算材料消耗定额?在某操作项目中,某种材料的净用量88.725kg/m3,合理操作损耗量是0.91kg/m3,合理管理损耗量是1.365kg/m3,概算定额=净用量+操作损耗量=88.725+0.91+1.635=91kg/m3材料消耗施工定额=有效消耗+合理的工艺消耗=88.725+0.91=89.635kg/m3