生产准备贯穿在实施准备阶段、实施阶段和投产竣工阶段,主要工作在( )阶段完成。
A.决策 B.实施准备 C.实施 D.投产竣工
参考答案:C
As a general rule, September is the worst month of the year for hurricanes in the Gulf.
A.Normally
B.On rare occasions
C.Invariably
D.Sometimes
某500kV架空线路档距800m,两侧悬点高差100m,钢芯铝绞心的比载为78.6×10-3N/(m.mm2),水平应力为82N/mm2,请问该档档内线长为下列哪项数值?(采用平抛物线公式)()
A.856m
B.842m
C.826m
D.819m