近期建设规划主要在土地使用、空间布局、基础设施支撑等方面为城市发展提供基础性框架,侧重于( )上的安排。
A.土地使用 B.空间布局C.时间序列 D.基础设施支撑
参考答案:B
When the system upon which a transport entity is running fails and subsequently restarts, the (1) information of all active connections is lost. The affected connections become half-open, as the side that did not fail does not yet realize the problem.
The still active side of a half-open connection can close the connection using a (2) timer. This timer measures the time the transport machine will continue to await an (3) of a transmitted segment after the segment has been retransmitted the maximum number of times. When the timer (4) , the transport entity assumes that either the other transport entity or the intervening network has failed. As a result, the timer closes the connection, and signals an abnormal close to the TS user.
In the event that a transport entity fails and quickly restarts, half-open connections can be terminated more quickly by the use of the RST segment. The failed side returns an RST i to every segment i that it receives. When the RST i reaches the other side, it must be checked for validity based on the (5) number i, as the RST could be in response to an old segment. If the reset is valid, the transport entity performs an abnormal termination.
3()
A.reset
B.acknowledgment
C.sequence
D.synchronizer
纸质商业汇票解挂业务受理:经办行收到客户提交的(),检查填写内容及相关手续符合规定,审查挂失申请人或经办人身份真实,《解除挂失止付申请书》与专夹保管的第二联《挂失止付通知书》核对无误,经运营主管审批后进行解挂交易处理。
A.《解除挂失止付申请书》
B.交回《挂失止付通知书》第一联
C.人民法院出具的《解除停止支付通知书》
D.《停止支付通知书》