问题 单项选择题

协调项目不同利益相关人的期望是一件相当困难的事情,这是因为______。

A.他们的期望往往是不切实际的
B.他们和建设项目实施组织之间没有管理关系
C.他们对期望的表达往往是不清晰的
D.他们的利益和期望往往是不一致的

答案

参考答案:D

解析:本题考核的是建设项目人力资源管理的方法。成功地管理和协调不同利益相关人的期望,也往往是一件相当困难的事情,这是因为不同利益相关人的期望和利益往往存在冲突。

填空题
用方框中所给词语的适当形式填空,使文章通顺、完整。(每词限用一次)
turn, better, give, she, scared, visit, close, open, but, everyone
In a happy town there lived a little, beautiful and smart girl, and               小题1:name was Rose.                  小题2: in the town liked her. She was so brave(勇敢的), but one thing she was scared of was the doctor.
One day her tooth was moving. Her mum saw it. She said, "Your tooth is moving, and you need to                小题3:Doctor Tim."
Rose said, "No! I am not going to the doctor. " Mum said, "Don' t worry. It' s not so wobbly(摆动的)now." That made Rose feel            小题4:.
After five weeks, Rose forgot about her tooth                小题5:her mum didn't. She checked her tooth again and it was wobbly, so she said, "It's time to see the doctor."
Rose was                 小题6:but she had to do what her mum told her, so they went to see Doctor Tim. They had to wait in the waiting room.
When it was her               小题7:, her heart was bumping(碰撞)very fast. She went into Doctor Tim' s room. He was smiling. She sat on the chair.
Doctor Tim said, "               小题8:your eyes. "
Rose closed her eyes, but just before Doctor Tim started, tears started coming down her eyes. But when she               小题9:her eyes, she saw Doctor Tim holding her tooth.
Rose smiled. Then Doctor Tim           小题10:her a teddy bear(泰迪熊)and from that time Rose wash' t scared of doctors any more.
单项选择题