Rebaselining may be required in cost control when ______ .
A) CVs are severe, and a realistic measure of performance is neededB) revised cost estimates are prepared and distributed to stakeholdersC) corrective action must be taken to bring expected future performance in line with the project planD) EAC shows that additional funds are needed to complete the project even if a scope change is not needed