设备工程设计过程进度控制就足通过设备工程设计( )来控制设计工作进度。
A.总进度计划
B.各设计单位的进度计划
C.主要部件图的进度计划
D.目标责任计划
参考答案:A
国产常用电气测量仪表分()级。
A.7
B.10
C.12
D.5
A ship must have a self-contained breathing apparatus to be used as protection from gas leaking from a refrigeration unit. To meet this requirement,you may use().
A.a gas mask certified by the Mine Safety and Health Administration
B.the same self-contained breathing apparatus required with the fireman's outfit
C.an oxygen breathing apparatus,provided that the device has been inspected within three years
D.a portable ventilation system that will provide a complete change of air every three minutes