砼预制桩应在砼达到设计强度的()后方可起吊,达到设计强度的()后方可运输和打桩。
参考答案:75%;100%
The old man got sick last summer and ______in bed since then . [ ]
A. was
B. had been
C. has been
D. would be
采暖入口的定位尺寸应为()。
A、管壁至所邻墙面的距离
B、管中心至柱子的距离
C、管中心至所邻墙面或轴线的距离
D、管壁面至所邻墙面或轴线的距离