热轧带肋钢筋横肋公称间距不得大于钢筋公称直径的()
A、0.6倍
B、0.5倍
C、0.7倍
D、0.8倍
参考答案:C
1964-1978年贵州成为全国三线建设的重点地区,国家投资近百亿元建成了()、()和()三大国防科技工业基地。
The purpose of the requirements definition phase is to produce a clear, complete,consistent, and testable______of the technical requirements for the software product. During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each______that it must meet. The starting point is usually a set of high-level requirements from the______that describe the project or problem. In either case, the requirements definition team formulates an overall concept for the system and then defines______showing how the system win be operated, publishes the system and operations concept document, and conducts asystem concept review(SCR). Following the SCR,the team derives______requirements for the system from the operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailedrequirement.
A.rules B.principles C.scenarios D.scenes