下列属于虚拟化解决方案的是()
A.Vmware标准版部署
B.Vmware企业增强版部署
C.虚拟化P2V迁移服务
D.Vmware企业版部署
参考答案:A, B, C, D
图形电镀法生产PCB时,电镀锡铅合金是在之后进行的()。
A.化学镀铜
B.电镀铜
C.电镀镍
D.电镀金
With a lot of difficult problems () , the manager felt worried all the time.
A. settled
B. to be settled
C. settling
D. to settle