问题 写作题

假设你是某所中学的学生 ,3月22日(世界水日)你参加了你班开展的一系列节水宣传活动。请根据以下四幅图的先后顺序,以日记的形式记录当天的活动内容。

注意:词数不少于60。

提示词:宣传材料leaflets;危机crisis

March 22,2010   Monday

Today is World Water Day.

答案

March 22, 2010      Monday                                            Sunny

Today is World Water Day. In the morning, we had a class meeting talking about what to do on this special day. Finally, we reached an agreement and immediately began to make preparations for the afternoon’s activities. 

At 2:00 pm, we went to the neighboring community to hand out leaflets, calling on people to save water. Around 3 o’clock, the expert we invited made an excellent speech on the current water crisis in China. He talked about the draught in the Southeast and the severe shortage of water in our city. The speech had a strong appeal to all the people present, including me.

After the speech, we had a discussion with our neighbors about various ways of saving water in our daily life. I suggested turning off the tap water immediately after use, and a granny came up with the ideas of reusing the water from kitchen, for example, the water after washing fruits and vegetables can be used to water flowers and so on.

Today, I have had a better understanding of the importance of saving water and really learned a lot about saving water.

题目分析:本文是一篇图画类作文,但要求以日记形式表述,因此要注意日记体的格式,时态应该使用一般过去时,第一人称。同时要按照图片中提供的时间发生的先后顺序,围绕所开展的一系列节水宣传活动进行叙述。

【亮点说明】(1)灵活运用高级句式如I have had a better understanding of the importance of saving water and really learned a lot about saving water. (2)好的短语如 reach an agreement,make preparations for,the severe shortage of ,have a discussion with sb(3)时间状语起到衔接的作用,如 In the morning,At 2:00 pm,Around 3 o’clock,After the speech等。

多项选择题

某承包商与业主签订了一份包工包料的单价合同,合同期为5个月。合同中含甲、乙两个分项工程,有关条款如下。 (1)甲、乙两个分项工程的清单工程量分别为4000m3、2500m3,单价分别为210元/m3、156元/m3。依据实际完成工程量进行结算。 (2)当某一分项工程实际工程量比清单工程量增加超出10%时,应调整单价,超出部分的单价调整系数为0.9,单价调整从累计的实际工程量超出清单工程量10%的月份开始;当某一分项工程实际工程量比清单工程量减少10%以上时,对该分项工程的全部工程量调整单价,单价调整系数为1.1,调价在最后一个月进行。 (3)措施项目清单共有5项,共计18万元,一次性包死,不得调价。全部措施项目费在开工后的前三个月末,按措施项目清单中的数额平均支付。 (4)规费费率为6%,其取费基数为各清单计价的总和;综合税率为3.41%。 (5)开工前业主向承包商支付的预付款按估计工程价款的20%计算,并在最后两个月平均分摊扣回。 (6)业主从第一个月起,从承包商的工程价款中,按5%的比例扣保留金。 工程实际完成情况如下表所示。

搜索

承包商计算第5个月应得进度款时,除该月分部分项工程量清单合计数额外,还需计算().

A.应扣回的预付款

B.应支付的措施项目费

C.应扣的保留金

D.应计的规费