问题 填空题

下图是同学们根据所学知识设计的一个趣味实验,请参与实验并回答问题:将分液漏斗里适量的水加人大试管中,使足够量的氢氧化钠固体完全溶解后,能观察到的现是 _________ ;产生上述现象的主要原因是 _________

答案

U型管中,a端水位下降,b端水位上升;氢氧化钠固体溶于水,放热,使试管内的气压升高

完形填空
完形填空
     On a cold November afternoon, my mother and I were walking home from a pizza store. We were
dressed warmly and   1   with the rented(租)video we had been dying for watch. I was feeling a little
   2  , as I was carrying our shopping bags of snacks and the  3  .They were so heavy that I decided to
  4  some things. So I started to walk towards the garbage can  5  I noticed a poor man walking his bike
out of the restaurant in front of us. He  6  a paper bag with his dirty hand. He headed over to another
nearby garbage can and started  7  it.
     I suddenly felt very   8  because I was about to do away with a new drink just  9  it was heavy. I
knew this man would take all he could   10  , so I walked up to him and  11  the drink and some snacks
to him. The man looked up    12   and took what I gave him. A huge smile spread  13   his face and this
caused me to feel indescribable   14   . I felt like I   15  be happier with myself, but then he said, "This is
my son's lucky day!"
     With that, he   16   me happily and started off on his bike. I even heard him  17    a song as he rode
away. I got a warm feeling inside and I knew I had done something good, for the man and his family. I
now understand what is   18   by the saying "Giving is getting".
Since then, every time I have the  19  to do something nice, the image of the man's happiness caused by
my small gift appears in my mind. This is the  20  of charity.
( )1. A. equipped    
( )2. A. upset      
( )3. A. video      
( )4. A. send off    
( )5. A. after      
( )6. A. owned      
( )7. A. going into  
( )8. A. stupid      
( )9. A. since      
( )10. A. get        
( )11. A. dropped    
( )12. A. sadly      
( )13. A. in        
( )14. A. regret    
( )15. A. couldn't  
( )16. A. smiled    
( )17. A. whistling  
( )18. A. referred  
( )19. A. time      
( )20. A. power      
B. covered      
B. happy        
B. books        
B. throw away    
B. when          
B. presented    
B. finding out  
B. guilty        
B. until        
B. search        
B. kept          
B. coldly        
B. across        
B. satisfaction  
B. shouldn't    
B. told          
B. whispering    
B. said          
B. chance        
B. effect        
C. done            
C. tire            
C. pizz            
C. put away        
C. before          
C. held            
C. looking through
C. disappointed    
C. because        
C. hear            
C. turned          
C. thankfully      
C. by              
C. failure        
C. needn't        
C. saw            
C. listening      
C. meant          
C. idea            
C. result          
D. offered      
D. excited      
D. clothes      
D send out      
D. while        
D. sought        
D. working out  
D. happy        
D. when          
D. see          
D. handed        
D. patiently    
D. through      
D. curiosity    
D. mustn't      
D. thanked      
D. making        
D. spoken        
D. effort        
D. mystery      
问答题

试题二(25分)阅读下列说明,回答问题1至问题3,将解答填入答题纸的对应栏内。[说明]某项目是一个新产品开发项目,项目计划开发周期为12个月,项目团队有11个人,包括:项目经理1人,开发工程师5人,测试工程师2人,文档工程师1人,配置管理1人,SQAl人。项目于2010年7月1日开始,项目计划如下:需求分析一个月,总体设计一个月,详细设计二个月,编码五个月,测试一个半月,文档准备、客户验收测试半个月,修改BUG并发布半个月。项目开工后,项目团队充满激情地努力工作,项目经理也非常有信心按期完成该项目,并在开工会上公布了该项目的考核与激励制度。2010年8月1日,项目组按期完成《需求规格设计说明书》,2010年9月1日,按期完成了总体设计。此时,市场部提出,最近有几家客户都问到这个产品了,9月份可能有客户要看演示的DEMO,需要加快开发进度,问项目经理是否可以先开发DEM0,详细设计到后面再补充,先把产品的原型做出来。项目经理经过与项目组及项目管理部协商,决定去掉详细设计这个环节,直接进入产品的编码阶段。安排开发工程师根据总体设计负责各自模块的开发工作。5名开发工程师组成的开发小组进入非常忙碌的编码阶段后,经常加班加点。开发过程中,由于原来制订的计划已完全被打乱,SQA无法再根据原来的质量保证计划进行跟踪,项目组其他人员也已无法发挥作用。2011年2月15日,项目经理向公司管理层反映这个项目存在问题,市场部提的需求有部分不能实现,遇到了技术瓶颈,而且有团队成员要离职。为此由项目管理部组织会议,对新增的部分需求进行评审,包括研发总监、研发副总裁在内,最终决定产品要继续开发,确定关键技术问题的解决时间为2011年3月15日,其他的工作继续进行。遗憾的是,关键技术问题一直到5月1日才解决,这时已有2名开发人员因为信心问题而离职,项目经理除了要考虑项目进度外,还要考虑项目资源,由于此时其他项目任务也很重,公司资源很紧张,他不得不重新招聘开发人员。等项目经理招到2个新人后,已是2011年6月15日,这本应是项目计划中系统测试结束的关键里程碑,但现在编码任务完成至少还需要一个月,在公司的月度会议上,项目经理向包括总裁在内的各位高层领导做了汇报,并因为项目进度延迟受到了批评。2011年8月1日,测试部终于拿到了系统的第一个测试版本。2011年10月20日,系统终于开发和测试完毕,测试部输出最终的测试报告,同意该产品向市场发布。所有的文档包括《详细设计》、《需求规格说明书》、《产品说明书》等还没有上传到配置库。

[问题3](10分)为了实现本题案例中市场部提出的要求,作为项目经理,你认为可以采取哪些措施来应对?