跨区域灭火救援行动中要加强信息反馈,保持通信联络畅通,确保信息传递的()。
A、准确性
B、完整性
C、一致性
D、持续性
E、连续性
参考答案:A, E
A.(A) We are content with our cooperation.
B.(B) We plan to strengthen our cooperation.
C.(C) The project was not approved by the two sides.
D.(D) The project was not completed on time.
已知:int m=10:在下列定义引用的语句中,正确的是【 】
A.int &x=m;
B.int y=&m;
C.int &z;
D.int &t=&m;