立式排水泵房的传动轴当装有中间轴承时应设置()工作台。
A.养护
B.观察
C.操作
D.备用
参考答案:A
三十六岁初产妇,曾有不孕症病史,G1P0。孕38周,因阵发性腹痛、见红入院。查体:宫高40cm,腹围126cm,B型超声提示双顶径10.2cm,单胎,羊水指数20.6cm。孕期曾行糖耐量试验正常。该孕妇应高度怀疑()
A.先兆早产
B.妊娠期肝内胆汁淤积症
C.妊娠期糖尿病
D.巨大胎儿
E.胎儿畸形
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable (46) of the technical requirements for the software product. During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each (47) that it must meet. The starting point is usually a set of high-level requirements from the (48) that describe the project or problem. In either case, the requirements definition team formulates an overall concept for the system and then defines (49) showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review (SCR). Following the SCR, the team derives (50) requirements for the system from the high-level requirements and the system and operations concept. Using structured or object-oriented analysis the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
A.detailed
B.outlined
C.total
D.complete