问题 阅读理解

阅读理解。

                           Make the best of graduation secondhand market

     The hottest items at graduation sales are secondhand textbooks and class notes from graduating

upperclassmen. Some even sell guidelines for exams. Books used by upperclassmen will surely help you

study.

     Classics ranging from The Romance of Three Kingdoms and A Dream of the Red Mansion to

English novels such as Pride and Prejudice, Da Vinci Code have price tags much lower than their market price.

     Senior women students sell off clothes for job interviews and dates with their boy friends. Some even

sell fashion hair straighteners and hairdryers. Most of them are in good condition. Secondhand bicycles

are always the stars of the sale. The tip is to buy a lock which matches the price of the bike.

     Electronic devices(装置)such as MP4 players, recorders and PCs are also popular. But be

careful when choosing because dorm electric devices can be in poor condition because of overuse.

1. What are the favorite things sold at the graduation sales?

A. MP4 players and fashion clothes.

B. Secondhand textbooks and class notes.

C. Classics and secondhand bikes.

D. PCs and fashion hair straighteners.

2. According to the text, what should be taken into account when you buy a used bike?

A. A good quality hairdryer.

B. An electronic device.

C. A fashion hair straightener.

D. A well-matched lock.

3. Why should electric devices be carefully chosen at the market?

A. Because they are practical at a low price.

B. Because they are bargains in good quality.

C. Because they have already been overused.

D. Because they will do harm to your health.

答案

1-3  BDC

填空题
问答题

某工程,建设单位和施工单位按《建设工程施工合同(示范文本)》签订了施工合同,在施工合同履行过程中发生以下事件:

事件1:工程开工前,总监理工程师主持召开了第一次工地会议。会上,总监理工程师宣布了建设单位对其的授权,并对召开工地例会提出了要求。会后,项目监理机构起草了会议纪要,由总监理工程师签字后分发给有关单位;总监理工程师主持编制了监理规划,报送建设单位。

事件2:施工过程中,由于施工单位遗失工程某部位设计图纸,施工人员凭经验施工,现场监理员发现时,该部位的施工已经完毕。监理员报告了总监理工程师,总监理工程师到现场后,指令施工单位暂停施工,并报告建设单位。建设单位要求设计单位对该部位结构进行核算。经设计单位核算,该部位结构能够满足安全和使用功能的要求,设计单位电话告知建设单位,可以不作处理。

事件3:由于事件2的发生,项目监理机构认为施工单位未按图施工,该部位工程不予计量;施工单位认为停工造成了工期拖延,向项目监理机构提出了工程延期申请。

事件4:主体结构施工时,由于发生不可抗力事件,造成施工现场用于工程的材料损坏,导致经济损失和工期拖延,施工单位按程序提出了工期和费用索赔。

事件5:施工单位为了确保安装质量,在施工组织设计原定检测计划的基础上,又委托一家检测单位加强安装过程的检测。安装工程结束时,施工单位要求项目监理机构支付其增加的检测费用,但被总监理工程师拒绝。

指出事件1的不妥之处,写出正确做法。