下列规划发展目标中,属于管理发展目标的是( )。
A.体制改革 B.医疗卫生C.教育水平 D.组织机构E.人员素质
参考答案:A,D,E
倒闸操作一般由两人进行,一人监护,一人操作
Developing reliable software on time and within (66) represents a difficult endeavor for many organizations.
Usually business solutions have three main aspects: people, (67) ,and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process (68) . Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool !"
Structured method was the first wave of the software industry. This was the beginning of transforming software development from a" (69) industry" to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry :"software industrialization". Software development will become like an assembly and manufacturing process. A cfiticalenabling factor is adisciplined software engineering . process with predictable quality, (70) and functionality.
(66)处填()。
A.forecast
B.preparation
C.budget
D.economy