问题 阅读理解

阅读理解。

     We often talk about the weather. If we want to know about the weather. We can turn on the radio (收

 音机) and listen to the weather report. We can also turn on the TV and watch the Weather Show. And

 we can ask other people in two different ways, "What's the weather like today?" or "How is the weather

 today?" Sometimes you can call at 121 for the weather.

     When it's cold, we shiver and need to wear warm clothes and scarfs. When it's raining, we need

 raining-coats or umbrellas (雨伞). When it's hot, we need a cool place and want a cold drink (饮料).

1. You can watch the Weather Show_____.

    A. on radio

    B. on TV

    C. at 121

    D. on other people

2. You can ask other people "_____" to know about the weather.

    A. What's the weather

    B. How is the weather like

    C. What does the weather like

    D. How is the weather

3. We want a cold drink when it's _____.

    A. cold

    B. warm

    C. hot

    D. raining

4. Telephone 121 is for _____.

    A. ill

    B. fire

    C. weather

    D. food

5. The word "shiver" is "_____" in Chinese.

    A. 颤抖

    B. 出汗

    C. 看病

    D. 避暑

答案

1—5: BDCCA

多项选择题

20×7年1月1日,甲公司与乙公司签订一项建造合同。合同约定:甲公司为乙公司建设一条高速公路,合同总价款80000万元;工期为2年。与上述建造合同相关的资料如下:

(1)20×7年1月10日开工建设,预计总成本68000万元。至20×7年12月31日,工程实际发生成本45000万元,由于材料价格上涨等因素预计还将发生工程成本45000万元;工程结算合同价款40000万元,实际收到价款36000万元。

(2)20×7年10月6日,经商议,乙公司书面同意追加合同价款2000万元。

(3)20×8年9月6日,工程完工并交付乙公司使用。至工程完工时,累计实际发生成本89000万元;累计工程结算合同价款82000万元,累计实际收到价款80000万元。

(4)20×8年11月12日,收到乙公司支付的合同奖励款400万元。同日,出售剩余物资产生收益250万元。

假定建造合同的结果能够可靠估计,甲公司按累计实际发生的合同成本占合同预计总成本的比例确定其完工进度。

要求:

根据上述资料,不考虑其他因素,回答下列问题。

下列各项关于甲公司上述建造合同会计处理的表述中,正确的有()

A.追加的合同价款计入合同收入

B.收到的合同奖励款计入合同收入

C.出售剩余物资产生的收益冲减合同成本

D.工程施工大于工程结算的金额作为存货项目列示

E.预计总成本超过总收入部分减去已确认合同损失后的金额确认为当期合同损失

单项选择题 共用题干题