问题 单项选择题

Visitors to this country are normally admitted for six months, but foreign students can usually stay for one year. They must (52) an educational institution, and they are required to study for a (53) of fifteen hours a week on a daytime course. Prospective students have to show that they can afford their studies, and that they have sufficient (54) resources to support themselves (55) in this country.

In order to work here the foreigner needs a work permit, (56) must be applied for by his prospective employer. The problem here is that the Department of Employment has the right to grant or (57) these permits, and there is little that can be done (58) it; it would be extremely unwise for a foreign visitor to work (59) a permit, since anyone doing so is liable to immediate deportation (驱逐出境). There are some people from the European countries, who are often given (60) residence permits of up to five years. Some other people, such as doctors, foreign journalists, authors and others can work without permits, and foreign students are normally allowed to (61) part-time jobs while they are studying here.

56().

A.it 

B.what 

C.that 

D.which

答案

参考答案:D

解析:

本题测试非限定性定语从句。此处缺少一个关系代词,代替a work permit,在从句中做主语,故应选which。

多项选择题

根据本案中双方所选择的贸易条件,美国公司承担的合同义务为:
广州某公司(买方)与美国某公司(卖方)于1996年1月10日签订了一份纯碱买卖合同,装运期限为1996年4月30日之前,以不可撤销信用证在纽约付款,贸易条件为CIF。同日,双方还签订了一个协议,规定广州公司于1996年3月6日之前将确定的开立信用证的日期电告美国公司。开证日期经美国公司电传同意后合同方生效。
  1996年3月4日,广州公司电传通知美国公司将不迟于3月9日开出信用证,请美国公司予以确认。3月6日,美国公司电传要求广州公司于3月7日17点之前将信用证开到纽约。同日,广州公司电传给美国公司表示时间太紧,要求延至3月8日开证,美国公司对此未予回复。3月10日,美国公司发传真给广州公司,要求尽快开证。3月14日,广州公司开出以美国公司为受益人的信用证。美国公司收到信用证后未对开证日期提出异议,但要求广州公司修改信用证的内容,广州公司认为此要求明显违反了买卖合同的规定,未予同意。此后广州公司电传催促美国公司告知装运日期及船名,并催美国公司按规定交货。5月26日美国公司电传广州公司,称广州公司未于3月9日之前开出信用证,已违反合同,且广州公司也未能按美国公司的要求修改信用证的内容,故美国公司有权不予发货。双方遂产生争议。请回答:

A.自行办理投保手续及承担相关费用,取得出口许可证

B.按照通常条件自行负担费用订立运输合同

C.办理货物在海运途中的灭失或损坏风险的一切险

D.自行负担费用提供为安排货物运输所要求的包装

问答题