问题
单项选择题
Each box is an activity; the number it contains is the duration of the activity in days. The duration of the critical path is ______.
答案
参考答案:C
Each box is an activity; the number it contains is the duration of the activity in days. The duration of the critical path is ______.
参考答案:C